The time required for the repair of a pothole depends on the material used and the ambient temperature. Considering the difficulties at the level of vehicular circulation involved in fixing a road, at T2S Ibérica we design materials with the aim of minimizing as much as possible the time required to resume traffic.

The ChipFill has an estimated repair time of 20 minutes, from start to open traffic. In this way, it is a material that allows repairs to be carried out quickly and minimizes the period of traffic interruption as much as possible.

Rollplast acrylic polymer resin is also widely chosen for its agile application, which lasts between 10 and 15 minutes. Its subsequent drying takes between 20 and 40 minutes, depending on the temperature of the environment. Between application and drying, it can take a minimum time of half an hour, and a maximum of 55 minutes.